- Columbia Gas Trans. Corp. June 1999 WV
Relocate 5000 ft. of 24” Pipeline
- Williams Co. (Texas Gas) July 1999 KY
Take up and Re-lay 19,000 ft. of 26” Pipeline.
- Equitable Resources July 1999 WV
12,000 ft. of 12” Pipeline.
- Columbia Gas Trans. Corp. August 1999 KY
30”, 20” & 14” Road Bores.
- Columbia Natural Resources September 1999 WV
26,000 ft. of 8” Pipeline.
- CNG Transmission Corp. March 2000 WV
13,000 ft. of 12” Pipeline
- Columbia Gas Trans. Corp. April 2000 WV
26,000 ft. of 4” and 26,000 ft. of 1” Pipelines,
(26) Well Head Hookups and drips
- Columbia Gas Trans. Corp. May 2000 WV
Excavate and Recoat approx. 2500 ft. – Various Locations
- Williams Co. (Texas Gas) June 2000 KY
1.75 Miles of 26”, 30” and 36” Replacements (Hardinsburg)
- Williams Co. (Texas Gas) June 2000 KY
1.75 Miles of 26” Replacements (Irvington)
- Washington Gas August 2000 MD
5300 ft. of 8” Pipeline
- Piedmont Natural Gas October 2000 SC
7 Miles of 8” Pipeline
- Piedmont Natural Gas January 2001 NC
2.4 Miles of 20” Pipeline
- Columbia Gas Trans. Corp. April 2001 WV
Excavate and Recoat 36” Pipeline – Various Lengths
- Williams Co. (Texas Gas) May 2001 KY
2.0 Miles of 26” Replacements
- Columbia Gas Trans. Corp. May 2001 WV
Storage Field Rehab and Excavate and Recoat
Various Sizes and Lengths
- Columbia Gas Trans. Corp. June 2001 VA
2200 ft. 20” Directional Drill
- Louisville Gas and Electric July 2001 KY
7.0 Miles of 24” Pipeline
- Columbia Gas Trans. Corp. July 2001 WV
(36) Replacement Sections – 20” Pipeline
- Columbia Gas Trans. Corp. August 2001 PA
Storage Field Rehabilitation – 4” to 16” Various Lengths
- Columbia Natural Resources August 2001 KY
24.0 Miles of 8” Pipeline
- Columbia Natural Resources September 2001 PA
1.0 Mile of 24” Pipeline
- Evan Energy (Duke) October 2001 KY
Compressor Station Piping and Installations
- Columbia Gas Trans. Corp. February 2002 WV
13,000 ft. of 16” Pipeline
- Piedmont Natural Gas Co. March 2002 NC/SC
Station Work at various locations
- Dominion Transmission, Inc. May 2002 VA
14.0 Miles of 20” Pipeline
- Columbia Gas Trans. Corp. May 2002 PA/MD
Storage Field Work and Remediation at various locations
- Columbia Gas Trans. Corp. June 2002 VA
2000 ft. of 30” Pipeline and 26” Testing
- Equitable Production August 2002 VA
14.0 Miles of 12” Pipeline
- Columbia Gas Trans. Corp. August 2002 WV
30” M & R and Crossover
- Columbia Gas Trans. Corp. August 2002 WV
Storage Field Work and Remediation
- Columbia Gas Trans. Corp. September 2002 WV
Storage Field Work and Remediation
- Columbia Gas Trans. Corp. October 2002 WV
1.1 Miles of 30” Pipeline
- Dominion Transmission, Inc. October 2002 WV
10” River Crossing
- Columbia Gas Trans. Corp. January 2003 WV
30” River Crossing
- East Kentucky Power Coop. June 2003 KY
6.2 miles of 20” Pipeline
- Columbia Gas Trans. Corp. July 2003 NY
2.1 miles of 10” Pipeline
- Columbia Gas Trans. Corp. August 2003 WV
1.2 miles of 30” Pipeline
- Columbia Gas Trans. Corp. September 2003 PA
1.3 miles of 24” Pipeline
- Columbia Gas Trans. Corp. September 2003 MD
1.9 miles of 30” Pipeline
- Columbia Gas Trans. Corp. May 2004 WV
IMP Project – 30” / 30” HDD River Crossing
- Texas Gas June 2004 KY
26” Main/Loop Road Change Bores
- Penn VA Oil and Gas September 2004 WV
16 miles of 12” Pipeline
- Columbia Gas Trans. Corp. October 2004 KY
4300 ft. of 20” Pipeline Relocation
- NCNG (Piedmont) September 2004 NC
16” Valve Setting Replacements
- National Fuel Gas Supply December 2004 PA
20” Longwall Mine Project
- Penn VA Oil and Gas February 2005 WV
2 miles of 12” Pipeline / Compressor Station Install
- Equitable Production March 2005 WV
9 miles of 10” and 2 miles of 6” Pipelines
- Columbia Gas Trans. Corp. March 2005 VA
20” Launcher and Receiver / 20” Scrubber / Hydrotesting
- MarkWest Hydrocarbon April 2005 WV/KY
63 miles of 4” and 5” Hydrotesting/Repairs
- Equitable Production July 2005 WV
10 miles of 6” Pipeline
- Columbia Gas of Ohio August 2005-2006 OH
25 miles of 24”/20”/12” Pipelines / HDDs
- Eastern American January 2006 WV
9 miles of 8” Pipeline
- Clean Gas March 2006 KY
27 miles of 8” Pipeline
- Columbia Gas April 2006 WV
Hardy Co., WV Storage Facility Construction, 56 miles
of 20”,12,”, 8”, 6”, 4”, 2”, 1” Pipelines
- Equitable Resources January 2007 KY
68.9 miles of 20” pipeline
- Equitable Resources/KY-WV Gas January 2008 KY
9 miles of 30” pipeline
- Equitable Resources May 2008 KY
1.5 miles of 20” and ½ mile of 8”
- Penn Virginia June 2008 WV
5 miles of 6”
- Equitable Resources June 2008 VA
6.8 miles of 6” and 1.3 miles of 12”
- Equitable Resources July 2008 WV
8.5 miles of 20”, 2/3 mile of 12”, and 127 ft of 8”
- NiSource/Columbia Gas May 2009 VA
Integrity Mgt. – Launchers-Receivers
- NiSource/Columbia Gas April 2009 WV
Anomaly Replacement/Slip Remediation
- Dominion Transmission August 2009 PA/MD
30” Hydrotest
- Tenaska July 2009 WV
6000 ft – 12” Launcher/Receiver
|